
Add to Cart
3.0" 304 Stainless Steel V-Band Clamp Exhaust Clamp For Flange Kit
Specifications of V band exhaust clamp assembly.
Size(Inch) | Flange ID(mm) | Exhaust pipe OD(mm) | Materials |
1.5 | 38.9 | 38.1 | Stainless steel 304 |
1.75 | 45.3 | 44.5 | |
2 | 51.6 | 50.8 | |
2.25 | 57.9 | 57.1 | |
2.5 | 64.3 | 63.5 | |
2.75 | 70.6 | 69.8 | |
3 | 77 | 76.2 | |
3.25 | 83.3 | 82.5 | |
3.5 | 89.7 | 88.9 | |
3.75 | 96.4 | 95.6 | |
4 | 102.4 | 101.6 | |
4.5 | 115.1 | 114.3 | |
5 | 127.8 | 127 | |
6 | 153.2 | 152.4 |
Features of Stainless steel V-Band Clamp
When compared to 2 or 3-bolt flanges, the V-band connections are lighter, quicker and easier to take apart. In most cases the V-band clamps are economical when you consider the cost of time in installation and reassembly. V-band connections require a smaller fitment envelope as compared with multi-bolt flanges, and the biggest advantage, the design of the V-band clamp applies uniform force around the flange which maximizes the seal potential of the flanges.
Applicaton of stainless steel V band clamp
V-Band Clamps are engineered and designed for heavy duty trucks, automotive, high performance and racing, generator and marine industries. Their tight design makes them a perfect solution for decreased emissions. Applications include:
Designs of Stainless steel V band clamp:
Installation of Stainless Steel V band clamp
For a V-band clamp to work optimally, proper installation is critical. Tubes and components of the coupling must be joined and aligned before installing the coupling. The flanges must also be aligned correctly prior to coupling installation for good joint performance.Tighten the nut to approximately 70% of the required torque (on double-latch assemblies, torque both latches equally). Check to assure the coupling has seated over flanges equally around the periphery. Also, check for correct flange alignment. Radial flange alignment can be checked visually in the gap between adjacent retainer segments.
Packing and delivery:
Package method:Separate carton for each, big carton outside or as clients's request
Delivery time:in 3 days if stocks available, new production time depends on ordered quantity
Payment terms:T/T (30% as deposit, balance shall be paid against the copy of bill.)
Shipping terms: FOB, CIF, CNF DDP etc.
Please contact Lily zhang for details. I am working here from 8:00 am to 5:00 pm on Monday~Friday.
Whatsapp:008618033796867
Wechat:13472162077
Email: market@ypmachinery.com